Daily Metal Prices

  • Nickel $18.29USD
  • Molybdenum $48.00USD
  • AUD-USD X-Rate 0.64USD

Brisbane Riverwalk Redevelopment

Midway Metals have been proud to be involved in the supply of materials and the construction of the new Brisbane City Riverwalk. The original Riverwalk structure was lost to the community in the flood waters back in January 2011.

The Riverwalk is an 850 metre stainless steel boardwalk linking New Farm to Howard Smith Wharves. It has been sorely missed since it’s demise as it was a popular venue for a leisurely weekend stroll. We are pleased to report that the project is well underway and the walk will soon be reinstated.

The Riverwalk consists of 3 sets of rails that have been constructed to help with movement and storage of the pre-cast girders.

Materials used on the Brisbane Riverwalk project

  • 2300 mtrs of 150x50mm x 6mm 316 Polished RHS
  • 360 mtrs of 150x100mm x 6mm 316 Polished RHS
  • 862 mtrs of 150x150x5mm 316 Polished RHS
  • 14,500 mtrs of 7/8″ 316 Round Bar
  • 1755 mtrs of 75x12mm 316 HRAP Flat Bar
  • 169 mtrs of 40x20mm 316 HRAP Flat Bar
  • 1500 mtrs of 45x6mm 316 Flat Bar from slitting and flat bar machine
  • 2000 mtrs of 2″ x 16# 316 Mirror Tube

Welding Consumables

  • 1 TONNE of 1.2mm Dia 316 Mig Wire
  • 1/2 TONNE of 0.9mm Dia 316 Mig Wire
  • 1/2 TONNE of 2.4mm & 3.2mm Dia Tig Wire

Welding Chemicals

  • 100 Litres of Avesta Classic Pickling Gel 122

316 Laser Cut Profile Plates

  • 5mm – 1 TONNE
  • 6mm – 20 TONNE – cast in plates (1500 cut segments)
  • 20mm – 5 TONNE

316 Plasma Cut Profile Plates

  • 10mm  – 2 TONNE
  • 12mm – 55 TONNE – base plates (1500 cut segments)
  • 16mm  – 75 TONNE – staunctions (1000 cut segments)

 

 

Take a look at our portfolio on Behance